PEOPLE can now officially have their say on design changes to the A358 upgrade from Taunton and the Southfields roundabout at Ilminster.

National Highways has today (May 24) launched a supplementary consultation for the upgrade of the A358 in Somerset.

The planned upgrade of the A358, a key route linking the South West and London and South East, will see a single lane stretch of carriageway between the M5 at Taunton and the Southfields roundabout upgraded to dual carriageway.

Katherine Liddington, senior project manager for the A358 scheme, said: “We plan to upgrade approximately 8.5 miles of the A358 to a new high-quality and high-performing dual carriageway, which will reduce congestion, enhance safety and improve connectivity for road users and local communities, while unlocking economic growth in Somerset and beyond.

Somerset County Gazette: A map summarising some of the improvements we’ve made since the public consultation in 2021.A map summarising some of the improvements we’ve made since the public consultation in 2021.

“Since our 2021 consultation we’ve made some changes to our preliminary design, which will improve safety and access to local roads and reduce the impact on communities, the environment and the local landscape.

Rebecca Pow MP added: “The A358 upgrade has been a long time coming and a great deal of progress has been made to reach this stage. It’s one of my commitments as your MP and I am pleased that Government is supporting this scheme.

“It is also most welcome that National Highways are listening to feedback and continuing to refine the route, something I have urged them to do as working with the community is vital."

Following more than 900 responses to a public consultation in 2021, National Highways has made further refinements to the proposed route including:

  • Nexus 25 junction – change from roundabout to signalised junction to accommodate signalised pedestrianised crossing and facilitate management of traffic in conjunction with M5 junction 25,
  • Mattocks Tree Green junction,
  • New connection at the eastern roundabout - for direct access to Village Road and onward travel to Hatch Beauchamp,
  • Realignment of Ash Road connection – removing the direct link between Ash Road and Mattocks Tree Green junction to discourage rat-running,
  • West Hatch Lane extension – providing a new public road alongside the A358 to allow more direct access to Mattocks Tree Green junction,
  • Bridge at Bickenhall Lane – moved to place it further from Bickenhall Wood ancient woodland and access for walkers, cyclists, horse-riders and disabled users and private farm access,
  • Capland Link – confirming that the link road is our chosen option and the route of the link road adjacent to the A358, and
  • Jordans bridge – a new link and bridge over the A358 between Ashill junction and Southfields roundabout for walkers, cyclists and horse-riders and disabled users and private farm access.

Somerset County Gazette: Visualisation showing the new proposed Nexus 25 junction looking north.Visualisation showing the new proposed Nexus 25 junction looking north.

Details about these and other changes made since our 2021 public consultation are available from today (24th May), with National Highways welcoming your feedback until the 26th June.

All plans will be available on a dedicated consultation website accessed here rom May 24.

National Highways is holding three public consultation events:

  • Thursday 26 May from 11am to 8pm: Monks Yard (Conference Room), Horton Cross Farm, Horton Cross, Ilminster, Somerset, TA19 9PT,
  • Wednesday 8 June from 11am to 8pm: Somerset County Cricket Club, The Cooper Associates County Ground, St. James Street, Taunton, Somerset, TA1 1JT, and
  • Saturday 11 June from 11am to 6pm: Taunton Racecourse, Orchard Portman, Taunton, Somerset, TA3 7BL.

There will also be four webinars, to book your place, click here.

 

READ MORE: Consultation proposed for the A358 Taunton to Ilminster upgrade